Skip to content

Commit

Permalink
P&P FASA Titan II tanks
Browse files Browse the repository at this point in the history
First stage (FASAGeminiLFTLong) same as proc price, 187
Second stage (FASAGeminiLFTMed) proc price + avionics @ ~1.5 per ton of control, 250
stratochief66 committed Dec 5, 2015
1 parent fb9fb34 commit 935bedf
Showing 1 changed file with 5 additions and 1 deletion.
6 changes: 5 additions & 1 deletion tree.yml
Original file line number Diff line number Diff line change
@@ -1654,7 +1654,6 @@ generalConstruction:
KIS_Container3:
cost: 180 # capacity 18000l


FASA_Atlas_LFT_Cone2: # Atlas E/F core
cost: 300 # cheaper than original
#below part is the Atlas SLV-3, 1966 first use. Lunar Orbiter
@@ -1664,6 +1663,11 @@ generalConstruction:
FASAAtlasLV3C:
cost: 400

FASAGeminiLFTLong:
cost: 187 # same as proc
FASAGeminiLFTMed:
cost: 250

# Lunar heatshields
HeatShield0:
entryCost: 31000

0 comments on commit 935bedf

Please sign in to comment.