Increase mounting holes, add courtyards around mounting holes, move conflicting resistors #132
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Was part of the discussion for #130.
Also increase the size of the mounting holes:
3.2mm is the standard mounting hole size for M3 screws. But this requires tight
tolerances that sometimes are difficult to achieve with hobbyist tools. 3.5mm
allows for more tolerance
a M3 washer has 7mm outer diameter. A 3mm screw+washer can be offset 0.5mm in a
3.5mm hole -> 8mm space necessary around the center of the hole. Add 1mm
clearance + tolerance around gives a 10mm diameter courtyard keepout zone
change to a pad style with small vias in it because the vias slightly increase
the adhesion of the copper to the FR4 material. I think it also looks nice.
Move R5 and R6 out of the way:
Do not change the lvds connector, even if it conflicts with the courtyard as per discussion on IRC.